|
|
The proposed project involves the proposed temporary drawdown, dewatering and dredging of approximately 1,850 cubic yards (CY) of material from Duck Pond and 2,250 CY of material from Reeds Pond. Non-mandatory pre-bid meeting 2/25/2026 at 10:00 AM.
|
|
|
| 2/11/2026 12:00 PM
|
|
|
| 3/12/2026 2:00 PM
|
|
|
| 03/12/2026 AT 2:00 pm
|
|
|
| dpw@wellesleyma.gov
|
|
|
| View Document(s)
|
|